Rebasing price indices civil engineering to 2010=100
Erratum 24 December 2014: After checking the document Rebasing input price indices of Civil engineering from 2005=100 to 2010=100 one table appeared to contain some inaccuracies. Table 3.1.1 on page 6 showed incorrect percentages for the area Bridges and tunnels and the subdivision Labour and Material and equipment for the series 2010=100. This table has been replaced by a new table containing the correct figures. There is also an annex added to the document in which an overview is included containing the weights per 2-digit prodcom and labour for the published series 2010=100.
Downloads
- File File - 2014-basisverlegging-eng-erratum