Base shift for input price indices Civil engineering from 2010=100 to 2015=100
1. Increase in number of price index series
With effect from the base shift from 2010=100 to 2015=100, the number of series published within CPA code 4212 has been increased with the addition of series 4212a Railways; New construction and 4212b Railways; Exploitation/maintenance. These two series concern heavy rail railways (rail tracks). That takes the total number of areas of civil engineering for which price indices are published to 10.