Civil engineering works; Input price index 2015=100
Deelgebieden | Perioden | Input price indices (2015=100) |
---|---|---|
42/43 Civil engineering works | 2012 January | 104.0 |
42/43 Civil engineering works | 2013 January | 106.0 |
42/43 Civil engineering works | 2014 January | 105.5 |
42/43 Civil engineering works | 2015 January | 100.0 |
42/43 Civil engineering works | 2016 January | 96.0 |
42/43 Civil engineering works | 2017 January | 103.2 |
42/43 Civil engineering works | 2018 January | 106.5 |
42/43 Civil engineering works | 2019 January | 110.3 |
42/43 Civil engineering works | 2020 January | 113.9 |
42/43 Civil engineering works | 2021 January | 114.0 |
42/43 Civil engineering works | 2022 January | 126.9 |
42/43 Civil engineering works | 2023 January* | 138.5 |
42/43 Civil engineering works | 2023 April* | 139.6 |
42/43 Civil engineering works | 2023 July* | 142.1 |
42/43 Civil engineering works | 2023 October* | 145.7 |
42/43 Civil engineering works | 2024 January* | 145.2 |
42/43 Civil engineering works | 2024 April* | 146.2 |
42/43 Civil engineering works | 2024 July* | 147.9 |
4211a Road construction; brick paving | 2012 January | 97.7 |
4211a Road construction; brick paving | 2013 January | 99.5 |
4211a Road construction; brick paving | 2014 January | 100.3 |
4211a Road construction; brick paving | 2015 January | 99.4 |
4211a Road construction; brick paving | 2016 January | 100.0 |
4211a Road construction; brick paving | 2017 January | 101.5 |
4211a Road construction; brick paving | 2018 January | 104.1 |
4211a Road construction; brick paving | 2019 January | 107.2 |
4211a Road construction; brick paving | 2020 January | 113.4 |
4211a Road construction; brick paving | 2021 January | 114.2 |
4211a Road construction; brick paving | 2022 January | 120.8 |
4211a Road construction; brick paving | 2023 January* | 133.6 |
4211a Road construction; brick paving | 2023 April* | 135.5 |
4211a Road construction; brick paving | 2023 July* | 137.1 |
4211a Road construction; brick paving | 2023 October* | 138.6 |
4211a Road construction; brick paving | 2024 January* | 140.7 |
4211a Road construction; brick paving | 2024 April* | 141.2 |
4211a Road construction; brick paving | 2024 July* | 142.4 |
4211b Road construction; asphalt paving | 2012 January | 132.6 |
4211b Road construction; asphalt paving | 2013 January | 133.3 |
4211b Road construction; asphalt paving | 2014 January | 130.7 |
4211b Road construction; asphalt paving | 2015 January | 100.8 |
4211b Road construction; asphalt paving | 2016 January | 84.0 |
4211b Road construction; asphalt paving | 2017 January | 108.2 |
4211b Road construction; asphalt paving | 2018 January | 114.4 |
4211b Road construction; asphalt paving | 2019 January | 124.6 |
4211b Road construction; asphalt paving | 2020 January | 124.9 |
4211b Road construction; asphalt paving | 2021 January | 118.2 |
4211b Road construction; asphalt paving | 2022 January | 140.8 |
4211b Road construction; asphalt paving | 2023 January* | 154.9 |
4211b Road construction; asphalt paving | 2023 April* | 153.7 |
4211b Road construction; asphalt paving | 2023 July* | 159.6 |
4211b Road construction; asphalt paving | 2023 October* | 176.3 |
4211b Road construction; asphalt paving | 2024 January* | 162.9 |
4211b Road construction; asphalt paving | 2024 April* | 164.7 |
4211b Road construction; asphalt paving | 2024 July* | 169.1 |
4212 Railways and underground railway. | 2012 January | 99.3 |
4212 Railways and underground railway. | 2013 January | 99.4 |
4212 Railways and underground railway. | 2014 January | 98.0 |
4212 Railways and underground railway. | 2015 January | 99.6 |
4212 Railways and underground railway. | 2016 January | 99.4 |
4212 Railways and underground railway. | 2017 January | 103.8 |
4212 Railways and underground railway. | 2018 January | 105.8 |
4212 Railways and underground railway. | 2019 January | 107.7 |
4212 Railways and underground railway. | 2020 January | 110.1 |
4212 Railways and underground railway. | 2021 January | 112.8 |
4212 Railways and underground railway. | 2022 January | 126.5 |
4212 Railways and underground railway. | 2023 January* | 134.7 |
4212 Railways and underground railway. | 2023 April* | 135.2 |
4212 Railways and underground railway. | 2023 July* | 133.4 |
4212 Railways and underground railway. | 2023 October* | 133.2 |
4212 Railways and underground railway. | 2024 January* | 134.3 |
4212 Railways and underground railway. | 2024 April* | 135.4 |
4212 Railways and underground railway. | 2024 July* | 137.8 |
4212a Railways; New construction | 2012 January | 98.9 |
4212a Railways; New construction | 2013 January | 99.8 |
4212a Railways; New construction | 2014 January | 99.1 |
4212a Railways; New construction | 2015 January | 99.6 |
4212a Railways; New construction | 2016 January | 99.7 |
4212a Railways; New construction | 2017 January | 102.9 |
4212a Railways; New construction | 2018 January | 105.4 |
4212a Railways; New construction | 2019 January | 108.0 |
4212a Railways; New construction | 2020 January | 110.4 |
4212a Railways; New construction | 2021 January | 113.5 |
4212a Railways; New construction | 2022 January | 125.5 |
4212a Railways; New construction | 2023 January* | 133.3 |
4212a Railways; New construction | 2023 April* | 134.4 |
4212a Railways; New construction | 2023 July* | 133.6 |
4212a Railways; New construction | 2023 October* | 133.5 |
4212a Railways; New construction | 2024 January* | 135.5 |
4212a Railways; New construction | 2024 April* | 136.3 |
4212a Railways; New construction | 2024 July* | 138.1 |
4212b Railways; Exploitation/Maintenance | 2012 January | 98.7 |
4212b Railways; Exploitation/Maintenance | 2013 January | 99.8 |
4212b Railways; Exploitation/Maintenance | 2014 January | 99.5 |
4212b Railways; Exploitation/Maintenance | 2015 January | 99.8 |
4212b Railways; Exploitation/Maintenance | 2016 January | 99.8 |
4212b Railways; Exploitation/Maintenance | 2017 January | 102.8 |
4212b Railways; Exploitation/Maintenance | 2018 January | 104.6 |
4212b Railways; Exploitation/Maintenance | 2019 January | 108.2 |
4212b Railways; Exploitation/Maintenance | 2020 January | 110.0 |
4212b Railways; Exploitation/Maintenance | 2021 January | 113.4 |
4212b Railways; Exploitation/Maintenance | 2022 January | 131.0 |
4212b Railways; Exploitation/Maintenance | 2023 January* | 142.3 |
4212b Railways; Exploitation/Maintenance | 2023 April* | 136.1 |
4212b Railways; Exploitation/Maintenance | 2023 July* | 133.6 |
4212b Railways; Exploitation/Maintenance | 2023 October* | 134.7 |
4212b Railways; Exploitation/Maintenance | 2024 January* | 133.9 |
4212b Railways; Exploitation/Maintenance | 2024 April* | 132.1 |
4212b Railways; Exploitation/Maintenance | 2024 July* | 134.3 |
4213 Bridges and tunnels; constructio. | 2012 January | 100.2 |
4213 Bridges and tunnels; constructio. | 2013 January | 100.8 |
4213 Bridges and tunnels; constructio. | 2014 January | 100.7 |
4213 Bridges and tunnels; constructio. | 2015 January | 99.9 |
4213 Bridges and tunnels; constructio. | 2016 January | 99.1 |
4213 Bridges and tunnels; constructio. | 2017 January | 102.4 |
4213 Bridges and tunnels; constructio. | 2018 January | 106.0 |
4213 Bridges and tunnels; constructio. | 2019 January | 108.6 |
4213 Bridges and tunnels; constructio. | 2020 January | 110.4 |
4213 Bridges and tunnels; constructio. | 2021 January | 114.7 |
4213 Bridges and tunnels; constructio. | 2022 January | 127.5 |
4213 Bridges and tunnels; constructio. | 2023 January* | 136.2 |
4213 Bridges and tunnels; constructio. | 2023 April* | 136.5 |
4213 Bridges and tunnels; constructio. | 2023 July* | 134.9 |
4213 Bridges and tunnels; constructio. | 2023 October* | 134.3 |
4213 Bridges and tunnels; constructio. | 2024 January* | 136.0 |
4213 Bridges and tunnels; constructio. | 2024 April* | 136.1 |
4213 Bridges and tunnels; constructio. | 2024 July* | 138.1 |
4221 Constructions and construction w. | 2012 January | 95.4 |
4221 Constructions and construction w. | 2013 January | 96.6 |
4221 Constructions and construction w. | 2014 January | 97.7 |
4221 Constructions and construction w. | 2015 January | 100.3 |
4221 Constructions and construction w. | 2016 January | 99.3 |
4221 Constructions and construction w. | 2017 January | 103.5 |
4221 Constructions and construction w. | 2018 January | 107.2 |
4221 Constructions and construction w. | 2019 January | 110.4 |
4221 Constructions and construction w. | 2020 January | 116.3 |
4221 Constructions and construction w. | 2021 January | 119.0 |
4221 Constructions and construction w. | 2022 January | 128.4 |
4221 Constructions and construction w. | 2023 January* | 143.0 |
4221 Constructions and construction w. | 2023 April* | 146.7 |
4221 Constructions and construction w. | 2023 July* | 151.7 |
4221 Constructions and construction w. | 2023 October* | 151.3 |
4221 Constructions and construction w. | 2024 January* | 153.0 |
4221 Constructions and construction w. | 2024 April* | 153.8 |
4221 Constructions and construction w. | 2024 July* | 155.7 |
4291 Constructions and construction w. | 2012 January | 100.1 |
4291 Constructions and construction w. | 2013 January | 104.8 |
4291 Constructions and construction w. | 2014 January | 104.4 |
4291 Constructions and construction w. | 2015 January | 99.6 |
4291 Constructions and construction w. | 2016 January | 96.5 |
4291 Constructions and construction w. | 2017 January | 100.6 |
4291 Constructions and construction w. | 2018 January | 104.1 |
4291 Constructions and construction w. | 2019 January | 108.0 |
4291 Constructions and construction w. | 2020 January | 113.5 |
4291 Constructions and construction w. | 2021 January | 114.9 |
4291 Constructions and construction w. | 2022 January | 125.6 |
4291 Constructions and construction w. | 2023 January* | 137.7 |
4291 Constructions and construction w. | 2023 April* | 140.8 |
4291 Constructions and construction w. | 2023 July* | 144.8 |
4291 Constructions and construction w. | 2023 October* | 148.2 |
4291 Constructions and construction w. | 2024 January* | 151.1 |
4291 Constructions and construction w. | 2024 April* | 152.0 |
4291 Constructions and construction w. | 2024 July* | 152.9 |
4312 Site preparation works | 2012 January | 98.3 |
4312 Site preparation works | 2013 January | 104.2 |
4312 Site preparation works | 2014 January | 103.5 |
4312 Site preparation works | 2015 January | 99.6 |
4312 Site preparation works | 2016 January | 96.2 |
4312 Site preparation works | 2017 January | 100.1 |
4312 Site preparation works | 2018 January | 103.3 |
4312 Site preparation works | 2019 January | 105.4 |
4312 Site preparation works | 2020 January | 110.4 |
4312 Site preparation works | 2021 January | 110.5 |
4312 Site preparation works | 2022 January | 121.5 |
4312 Site preparation works | 2023 January* | 134.9 |
4312 Site preparation works | 2023 April* | 134.4 |
4312 Site preparation works | 2023 July* | 137.4 |
4312 Site preparation works | 2023 October* | 142.2 |
4312 Site preparation works | 2024 January* | 145.3 |
4312 Site preparation works | 2024 April* | 147.0 |
4312 Site preparation works | 2024 July* | 146.3 |
4321 Electrical installation works | 2012 January | 99.3 |
4321 Electrical installation works | 2013 January | 99.6 |
4321 Electrical installation works | 2014 January | 98.9 |
4321 Electrical installation works | 2015 January | 100.1 |
4321 Electrical installation works | 2016 January | 99.1 |
4321 Electrical installation works | 2017 January | 103.5 |
4321 Electrical installation works | 2018 January | 103.8 |
4321 Electrical installation works | 2019 January | 104.4 |
4321 Electrical installation works | 2020 January | 105.7 |
4321 Electrical installation works | 2021 January | 105.1 |
4321 Electrical installation works | 2022 January | 117.9 |
4321 Electrical installation works | 2023 January* | 124.4 |
4321 Electrical installation works | 2023 April* | 123.3 |
4321 Electrical installation works | 2023 July* | 120.3 |
4321 Electrical installation works | 2023 October* | 119.7 |
4321 Electrical installation works | 2024 January* | 121.0 |
4321 Electrical installation works | 2024 April* | 121.5 |
4321 Electrical installation works | 2024 July* | 122.5 |
Source: CBS. |
Table explanation
This table shows the input price indices of the costs of labour, materials and equipment for civil engineering works (in Dutch: Grond-, weg- en waterbouw (GWW)). There are ten areas within civil engineering. These areas are based on the standard Classification Products to Activity. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed. The price index for the total of civil engineering is a weighted average of the eight areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account.
Changes compared with twelve months previously are also published for all indices.
Data available from:
The input price indices in this series are available from January 2012 on.
Status of the figures:
Index figures up to 2022 are definite. Other index figures are provisional.
The period the price indices remain provisional depends on the moment that the collectively negotiated (Cao) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review.
Changes as of August 30th 2024:
The figures of July 2024 are added to the table.
When will new figures be published?
Provisional figures for October 2024 will be published at the end of November 2024.
Description topics
- Input price indices
- An index is the ratio between the value of a variable in a given period and the value of that variable in a chosen fixed (reference) period.
In this table the variable is the price trends in civil engineering. This is a weighted average of price movements of the components wages, materials and equipment (tools and machinery).