Areas of civil engineering works | Periods | Input price index (2000=100) | Changes compared with one year earlier (%) |
---|---|---|---|
42/43 Civil engineering works | 1979 February | ||
42/43 Civil engineering works | 1980 February | ||
42/43 Civil engineering works | 1985 February | ||
42/43 Civil engineering works | 1990 February | ||
42/43 Civil engineering works | 1995 February | ||
42/43 Civil engineering works | 2000 January | 97.8 | |
42/43 Civil engineering works | 2005 January | 110.7 | 3.2 |
42/43 Civil engineering works | 2010 January | 136.8 | 2.9 |
42/43 Civil engineering works | 2015 January | 146.3 | -2.6 |
42/43 Civil engineering works | 2016 January | 143.9 | -1.7 |
42/43 Civil engineering works | 2017 January | 151.3 | 5.2 |
42/43 Civil engineering works | 2018 January | 154.2 | 1.9 |
42/43 Civil engineering works | 2019 January | 157.4 | 2.1 |
42/43 Civil engineering works | 2020 January | 162.5 | 3.3 |
42/43 Civil engineering works | 2021 January | 162.7 | 0.1 |
42/43 Civil engineering works | 2022 January | 181.0 | 11.3 |
42/43 Civil engineering works | 2023 January | 197.8 | 9.3 |
42/43 Civil engineering works | 2023 April | 199.4 | -0.7 |
42/43 Civil engineering works | 2023 July | 202.9 | 0.5 |
42/43 Civil engineering works | 2023 October | 208.1 | 3.9 |
42/43 Civil engineering works | 2024 January* | 207.5 | 4.9 |
42/43 Civil engineering works | 2024 April* | 209.0 | 4.8 |
42/43 Civil engineering works | 2024 July* | 212.5 | 4.7 |
42/43 Civil engineering works | 2024 October* | 209.9 | 0.8 |
4211a Road construction; brick paving | 1979 February | 54.4 | |
4211a Road construction; brick paving | 1980 February | 59.6 | 9.5 |
4211a Road construction; brick paving | 1985 February | 67.2 | 2.1 |
4211a Road construction; brick paving | 1990 February | 76.5 | 3.8 |
4211a Road construction; brick paving | 1995 February | 88.7 | 2.2 |
4211a Road construction; brick paving | 2000 January | 99.1 | 3.1 |
4211a Road construction; brick paving | 2005 January | 111.5 | -1.0 |
4211a Road construction; brick paving | 2010 January | 126.9 | 2.1 |
4211a Road construction; brick paving | 2015 January | 131.5 | -1.6 |
4211a Road construction; brick paving | 2016 January | 132.0 | 0.4 |
4211a Road construction; brick paving | 2017 January | 135.1 | 2.3 |
4211a Road construction; brick paving | 2018 January | 137.7 | 2.0 |
4211a Road construction; brick paving | 2019 January | 142.2 | 3.3 |
4211a Road construction; brick paving | 2020 January | 150.5 | 5.8 |
4211a Road construction; brick paving | 2021 January | 151.6 | 0.7 |
4211a Road construction; brick paving | 2022 January | 160.2 | 5.7 |
4211a Road construction; brick paving | 2023 January | 177.3 | 10.6 |
4211a Road construction; brick paving | 2023 April | 179.8 | 8.6 |
4211a Road construction; brick paving | 2023 July | 181.9 | 7.5 |
4211a Road construction; brick paving | 2023 October | 183.9 | 6.9 |
4211a Road construction; brick paving | 2024 January* | 186.7 | 5.3 |
4211a Road construction; brick paving | 2024 April* | 187.2 | 4.1 |
4211a Road construction; brick paving | 2024 July* | 190.4 | 4.6 |
4211a Road construction; brick paving | 2024 October* | 190.3 | 3.5 |
4211b Road construction; asphalt paving | 1979 February | 49.2 | |
4211b Road construction; asphalt paving | 1980 February | 61.5 | 25.1 |
4211b Road construction; asphalt paving | 1985 February | 80.1 | 8.0 |
4211b Road construction; asphalt paving | 1990 February | 74.2 | 8.2 |
4211b Road construction; asphalt paving | 1995 February | 85.8 | 2.9 |
4211b Road construction; asphalt paving | 2000 January | 97.8 | 7.1 |
4211b Road construction; asphalt paving | 2005 January | 108.2 | -0.4 |
4211b Road construction; asphalt paving | 2010 January | 149.7 | 7.9 |
4211b Road construction; asphalt paving | 2015 January | 161.7 | -6.8 |
4211b Road construction; asphalt paving | 2016 January | 152.5 | -5.7 |
4211b Road construction; asphalt paving | 2017 January | 166.8 | 9.3 |
4211b Road construction; asphalt paving | 2018 January | 170.4 | 2.2 |
4211b Road construction; asphalt paving | 2019 January | 167.2 | -1.9 |
4211b Road construction; asphalt paving | 2020 January | 167.6 | 0.2 |
4211b Road construction; asphalt paving | 2021 January | 158.7 | -5.3 |
4211b Road construction; asphalt paving | 2022 January | 189.0 | 19.1 |
4211b Road construction; asphalt paving | 2023 January | 208.8 | 10.5 |
4211b Road construction; asphalt paving | 2023 April | 207.3 | -14.5 |
4211b Road construction; asphalt paving | 2023 July | 215.3 | -9.8 |
4211b Road construction; asphalt paving | 2023 October | 237.9 | 10.0 |
4211b Road construction; asphalt paving | 2024 January* | 219.7 | 5.2 |
4211b Road construction; asphalt paving | 2024 April* | 222.9 | 7.5 |
4211b Road construction; asphalt paving | 2024 July* | 228.4 | 6.1 |
4211b Road construction; asphalt paving | 2024 October* | 218.0 | -8.4 |
4211c Road maintenance | 1979 February | 48.6 | |
4211c Road maintenance | 1980 February | 56.8 | 16.9 |
4211c Road maintenance | 1985 February | 69.7 | 3.2 |
4211c Road maintenance | 1990 February | 74.7 | 5.7 |
4211c Road maintenance | 1995 February | 87.4 | 1.9 |
4211c Road maintenance | 2000 January | 97.8 | 7.0 |
4211c Road maintenance | 2005 January | ||
4211c Road maintenance | 2010 January | ||
4211c Road maintenance | 2015 January | ||
4211c Road maintenance | 2016 January | ||
4211c Road maintenance | 2017 January | ||
4211c Road maintenance | 2018 January | ||
4211c Road maintenance | 2019 January | ||
4211c Road maintenance | 2020 January | ||
4211c Road maintenance | 2021 January | ||
4211c Road maintenance | 2022 January | ||
4211c Road maintenance | 2023 January | ||
4211c Road maintenance | 2023 April | ||
4211c Road maintenance | 2023 July | ||
4211c Road maintenance | 2023 October | ||
4211c Road maintenance | 2024 January* | ||
4211c Road maintenance | 2024 April* | ||
4211c Road maintenance | 2024 July* | ||
4211c Road maintenance | 2024 October* | ||
4212 Railways and underground railway. | 1979 February | ||
4212 Railways and underground railway. | 1980 February | ||
4212 Railways and underground railway. | 1985 February | ||
4212 Railways and underground railway. | 1990 February | ||
4212 Railways and underground railway. | 1995 February | ||
4212 Railways and underground railway. | 2000 January | 98.2 | |
4212 Railways and underground railway. | 2005 January | 120.2 | 8.6 |
4212 Railways and underground railway. | 2010 January | 143.1 | -0.5 |
4212 Railways and underground railway. | 2015 January | 154.6 | 1.5 |
4212 Railways and underground railway. | 2016 January | 156.7 | 1.4 |
4212 Railways and underground railway. | 2017 January | 160.6 | 2.5 |
4212 Railways and underground railway. | 2018 January | 162.0 | 0.9 |
4212 Railways and underground railway. | 2019 January | 165.2 | 2.0 |
4212 Railways and underground railway. | 2020 January | 168.9 | 2.2 |
4212 Railways and underground railway. | 2021 January | 173.0 | 2.4 |
4212 Railways and underground railway. | 2022 January | 194.1 | 12.2 |
4212 Railways and underground railway. | 2023 January | 206.5 | 6.4 |
4212 Railways and underground railway. | 2023 April | 207.4 | 1.3 |
4212 Railways and underground railway. | 2023 July | 204.6 | -0.8 |
4212 Railways and underground railway. | 2023 October | 204.3 | -0.9 |
4212 Railways and underground railway. | 2024 January* | 206.0 | -0.3 |
4212 Railways and underground railway. | 2024 April* | 207.6 | 0.1 |
4212 Railways and underground railway. | 2024 July* | 211.7 | 3.5 |
4212 Railways and underground railway. | 2024 October* | 209.1 | 2.3 |
4213 Bridges and tunnels; constructio. | 1979 February | ||
4213 Bridges and tunnels; constructio. | 1980 February | ||
4213 Bridges and tunnels; constructio. | 1985 February | ||
4213 Bridges and tunnels; constructio. | 1990 February | ||
4213 Bridges and tunnels; constructio. | 1995 February | ||
4213 Bridges and tunnels; constructio. | 2000 January | 98.5 | |
4213 Bridges and tunnels; constructio. | 2005 January | 107.1 | 0.5 |
4213 Bridges and tunnels; constructio. | 2010 January | 119.0 | -9.1 |
4213 Bridges and tunnels; constructio. | 2015 January | 124.7 | -1.3 |
4213 Bridges and tunnels; constructio. | 2016 January | 124.1 | -0.5 |
4213 Bridges and tunnels; constructio. | 2017 January | 128.2 | 3.2 |
4213 Bridges and tunnels; constructio. | 2018 January | 132.6 | 3.5 |
4213 Bridges and tunnels; constructio. | 2019 January | 135.3 | 2.0 |
4213 Bridges and tunnels; constructio. | 2020 January | 137.5 | 1.6 |
4213 Bridges and tunnels; constructio. | 2021 January | 142.9 | 3.9 |
4213 Bridges and tunnels; constructio. | 2022 January | 158.8 | 11.2 |
4213 Bridges and tunnels; constructio. | 2023 January | 169.7 | 6.8 |
4213 Bridges and tunnels; constructio. | 2023 April | 170.1 | -1.6 |
4213 Bridges and tunnels; constructio. | 2023 July | 168.0 | -2.0 |
4213 Bridges and tunnels; constructio. | 2023 October | 167.2 | -1.6 |
4213 Bridges and tunnels; constructio. | 2024 January* | 169.5 | -0.1 |
4213 Bridges and tunnels; constructio. | 2024 April* | 169.4 | -0.4 |
4213 Bridges and tunnels; constructio. | 2024 July* | 172.7 | 2.8 |
4213 Bridges and tunnels; constructio. | 2024 October* | 171.5 | 2.6 |
4221 Constructions and construction w. | 1979 February | 51.8 | |
4221 Constructions and construction w. | 1980 February | 56.2 | 8.4 |
4221 Constructions and construction w. | 1985 February | 68.4 | 3.1 |
4221 Constructions and construction w. | 1990 February | 77.8 | 3.8 |
4221 Constructions and construction w. | 1995 February | 90.2 | 1.8 |
4221 Constructions and construction w. | 2000 January | 98.9 | 1.5 |
4221 Constructions and construction w. | 2005 January | 120.9 | 5.2 |
4221 Constructions and construction w. | 2010 January | 135.3 | -2.8 |
4221 Constructions and construction w. | 2015 January | 144.3 | -0.5 |
4221 Constructions and construction w. | 2016 January | 143.8 | -0.3 |
4221 Constructions and construction w. | 2017 January | 147.1 | 2.3 |
4221 Constructions and construction w. | 2018 January | 150.4 | 2.3 |
4221 Constructions and construction w. | 2019 January | 155.8 | 3.6 |
4221 Constructions and construction w. | 2020 January | 164.2 | 5.4 |
4221 Constructions and construction w. | 2021 January | 167.9 | 2.3 |
4221 Constructions and construction w. | 2022 January | 181.2 | 8.0 |
4221 Constructions and construction w. | 2023 January | 201.8 | 11.4 |
4221 Constructions and construction w. | 2023 April | 207.0 | 6.5 |
4221 Constructions and construction w. | 2023 July | 214.1 | 11.1 |
4221 Constructions and construction w. | 2023 October | 213.5 | 4.0 |
4221 Constructions and construction w. | 2024 January* | 215.9 | 7.0 |
4221 Constructions and construction w. | 2024 April* | 217.0 | 4.9 |
4221 Constructions and construction w. | 2024 July* | 222.3 | 3.8 |
4221 Constructions and construction w. | 2024 October* | 222.1 | 4.0 |
4291 Constructions and construction w. | 1979 February | ||
4291 Constructions and construction w. | 1980 February | ||
4291 Constructions and construction w. | 1985 February | ||
4291 Constructions and construction w. | 1990 February | ||
4291 Constructions and construction w. | 1995 February | ||
4291 Constructions and construction w. | 2000 January | 96.9 | |
4291 Constructions and construction w. | 2005 January | 117.4 | 7.2 |
4291 Constructions and construction w. | 2010 January | 132.7 | 0.2 |
4291 Constructions and construction w. | 2015 January | 142.8 | -5.9 |
4291 Constructions and construction w. | 2016 January | 136.8 | -4.2 |
4291 Constructions and construction w. | 2017 January | 148.4 | 8.5 |
4291 Constructions and construction w. | 2018 January | 151.5 | 2.1 |
4291 Constructions and construction w. | 2019 January | 157.5 | 4.0 |
4291 Constructions and construction w. | 2020 January | 165.6 | 5.1 |
4291 Constructions and construction w. | 2021 January | 167.5 | 1.2 |
4291 Constructions and construction w. | 2022 January | 183.1 | 9.3 |
4291 Constructions and construction w. | 2023 January | 200.9 | 9.7 |
4291 Constructions and construction w. | 2023 April | 205.5 | 3.5 |
4291 Constructions and construction w. | 2023 July | 211.4 | 4.8 |
4291 Constructions and construction w. | 2023 October | 216.3 | 7.9 |
4291 Constructions and construction w. | 2024 January* | 220.5 | 9.8 |
4291 Constructions and construction w. | 2024 April* | 221.9 | 8.0 |
4291 Constructions and construction w. | 2024 July* | 224.4 | 6.2 |
4291 Constructions and construction w. | 2024 October* | 223.6 | 3.4 |
4312 Site preparation works | 1979 February | 56.7 | |
4312 Site preparation works | 1980 February | 62.7 | 10.6 |
4312 Site preparation works | 1985 February | 72.1 | 3.2 |
4312 Site preparation works | 1990 February | 78.9 | 4.3 |
4312 Site preparation works | 1995 February | 90.1 | 1.3 |
4312 Site preparation works | 2000 January | 99.0 | 3.1 |
4312 Site preparation works | 2005 January | 112.5 | 2.6 |
4312 Site preparation works | 2010 January | 135.4 | 1.7 |
4312 Site preparation works | 2015 January | 140.3 | -3.9 |
4312 Site preparation works | 2016 January | 136.8 | -2.5 |
4312 Site preparation works | 2017 January | 145.0 | 6.0 |
4312 Site preparation works | 2018 January | 148.2 | 2.2 |
4312 Site preparation works | 2019 January | 152.3 | 2.7 |
4312 Site preparation works | 2020 January | 159.6 | 4.8 |
4312 Site preparation works | 2021 January | 159.6 | 0.0 |
4312 Site preparation works | 2022 January | 175.6 | 10.0 |
4312 Site preparation works | 2023 January | 195.0 | 11.1 |
4312 Site preparation works | 2023 April | 194.2 | 1.8 |
4312 Site preparation works | 2023 July | 198.6 | 0.7 |
4312 Site preparation works | 2023 October | 205.6 | 2.6 |
4312 Site preparation works | 2024 January* | 209.9 | 7.6 |
4312 Site preparation works | 2024 April* | 212.3 | 9.4 |
4312 Site preparation works | 2024 July* | 212.7 | 7.1 |
4312 Site preparation works | 2024 October* | 210.9 | 2.6 |
4321 Electrical installation works | 1979 February | ||
4321 Electrical installation works | 1980 February | ||
4321 Electrical installation works | 1985 February | ||
4321 Electrical installation works | 1990 February | ||
4321 Electrical installation works | 1995 February | ||
4321 Electrical installation works | 2000 January | 98.4 | |
4321 Electrical installation works | 2005 January | 109.6 | 5.0 |
4321 Electrical installation works | 2010 January | 122.9 | 0.9 |
4321 Electrical installation works | 2015 January | 130.1 | 2.2 |
4321 Electrical installation works | 2016 January | 133.1 | 2.3 |
4321 Electrical installation works | 2017 January | 137.8 | 3.6 |
4321 Electrical installation works | 2018 January | 137.8 | 0.0 |
4321 Electrical installation works | 2019 January | 141.3 | 2.6 |
4321 Electrical installation works | 2020 January | 143.2 | 1.3 |
4321 Electrical installation works | 2021 January | 142.4 | -0.6 |
4321 Electrical installation works | 2022 January | 159.6 | 12.1 |
4321 Electrical installation works | 2023 January | 168.5 | 5.5 |
4321 Electrical installation works | 2023 April | 167.0 | -1.0 |
4321 Electrical installation works | 2023 July | 162.9 | -5.7 |
4321 Electrical installation works | 2023 October | 162.1 | -5.1 |
4321 Electrical installation works | 2024 January* | 163.9 | -2.7 |
4321 Electrical installation works | 2024 April* | 164.8 | -1.3 |
4321 Electrical installation works | 2024 July* | 166.6 | 2.3 |
4321 Electrical installation works | 2024 October* | 165.2 | 1.9 |
Source: CBS. |
Table explanation
The historical series 'Civil engineering; input price index 2000=100, since 1979' represents the trend of the costs of labour, material and equipment involved in projects in various areas of civil engineering (in Dutch: Grond-, Weg- en Waterbouw (GWW)) in the Netherlands. This series was created by linking independently calculated series from the past.
At this moment, there are eight areas within civil engineering. These areas are based on the standard Classification Products to Activity (CPA). There is also one area of which the observation has stopped. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed.. The price index for the total of civil engineering is a weighted average of the eight areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account. Changes in excise duties (such as that of diesel, used in civil engineering works, from 1/1/2013) are also not reflected in the price indices.
Changes compared with twelve months previously are also published for all indices.
Data available from:
The various series of price indices of Civil Engineering cover different periods. Some start in 1979, while others start at the shift to 2000=100. For each series, the period for which it contains figures is given below:
- Constructions for fluids: February 1979
- Road construction: February 1979
- Road maintenance: February 1979; discontinued from October 2004
- Site preparation works: February 1979
- Civil engineering works: January 2000
- Bridges and tunnels: January 2000
- Railways and underground railways: January 2000
- Constructions for water projects: January 2000
- Electrical installation works: January 2005
Status of the figures:
Index figures up to 2023 are definite. Other index figures are provisional. The period the price indices remain provisional depends on the moment that the collectively negotiated (CAO) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review.
Changes as of November 29th 2024:
The figures of October 2024 are added to the table.
When will new figures be published?
Provisional figures for Januari 2025 will be published at the end of Februari 2025.
Description topics
- Input price index
- An input index is an index seen from the cost of the producer. The input price index of Civil Engineering Works reflects the weighted average of price movements of the components wages, materials and equipment (tools and machinery).
---
An index is the ratio between the value of a variable in a given period and the value of that variable in a chosen fixed (reference) period. - Changes compared with one year earlier
- Year-on-year percentage change. The price index of a period is compared with the price index of the same period in the previous year.