Civil engineering works; price index 2005 = 100, 2005 - 2013
Areas civil engineering works | Periods | Input price indices (2005=100) | Changes compared to 1 year previously (%) |
---|---|---|---|
4221: Constructions for fluids | 2013 January | 116 | 1.5 |
4221: Constructions for fluids | 2013 April | 116 | 0.8 |
4221: Constructions for fluids | 2013 July | 116 | 1.1 |
4221: Constructions for fluids | 2013 October | 116 | 0.0 |
4291: Constructions for water projects | 2013 January | 128 | 1.9 |
4291: Constructions for water projects | 2013 April | 127 | -0.1 |
4291: Constructions for water projects | 2013 July | 128 | 1.1 |
4291: Constructions for water projects | 2013 October | 127 | -0.6 |
Source: CBS. |
Table explanation
Price indices on the basis of 2005=100 and changes compared to
1 year previously regarding several areas of work.
January 2005 - October 2013
Changed on June 25 2014.
Frequency: Discontinued.
1 year previously regarding several areas of work.
January 2005 - October 2013
Changed on June 25 2014.
Frequency: Discontinued.
Description topics
- Input price indices
- An index is the ratio between the value of a variable in a given period
and the value of that variable in a chosen fixed (reference) period.
---
In this table the variable is the price trends in civil engineering. This
is a weighted average of price movements of the components wages,
materials and equipment (tools and machinery). - Changes compared to 1 year previously
- Percentage year on year development. The price index of a period is
compared to the price index of the same period one year earlier.