Price index civil engineering works, 2000 = 100
Periods | Total civil engineering works Indices (2000=100) | Total civil engineering works Changes compared to 1 year previously (%) | Sewerage construction Indices (2000=100) | Road construction Road construction with brick paving Indices (2000=100) | Road construction Road construction with asphalt paving Indices (2000=100) | Earth moving activities Indices (2000=100) | Execution of hydraulic engineering works Indices (2000=100) | Structural works (e.g. fly-over) Indices (2000=100) | Railway construction Indices (2000=100) |
---|---|---|---|---|---|---|---|---|---|
2010 January | 136 | 2.9 | 128 | 127 | 137 | 141 | 132 | 119 | 143 |
2010 April | 139 | 5.7 | 129 | 127 | 142 | 142 | 136 | 120 | 146 |
2010 July | 140 | 4.4 | 130 | 127 | 143 | 142 | 137 | 120 | 146 |
2010 October | 140 | 4.2 | 130 | 127 | 144 | 142 | 137 | 120 | 147 |
Source: CBS. |
Table explanation
Price indices on the basis of 2000=100 and changes compared to
1 year previously regarding several areas of work
January 2000 - October 2010
Changed on April 04 2011.
Frequency: Discontinued.
1 year previously regarding several areas of work
January 2000 - October 2010
Changed on April 04 2011.
Frequency: Discontinued.
Description topics
- Total civil engineering works
- Indices
- The price index is a weighted average of the 7 mentioned series,
completed with the price movement of electronic supplies.
For the weights of these parts as a whole, figures from "Nationale
Rekeningen" (NR, National Accounts) regarding the year 2000 are used.
- Changes compared to 1 year previously
- The changes are calculated from the price indices on total civil works
compared to the same month one year previously.
- Sewerage construction
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to sewerage construction inside built-up
areas.
- Road construction
- Road construction with brick paving
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to road construction with brick paving.
- Road construction with asphalt paving
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to road construction with asphalt
paving.
- Earth moving activities
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to earth moving activities.
- Execution of hydraulic engineering works
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to hydraulic engineering works.
- Structural works (e.g. fly-over)
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to structural works.
- Railway construction
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to railway construction.