Price index civil engineering works

Table explanation

Index construction sewer systems and roads, mechanical excavation and
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.

Description topics

Basis index figures 15 February 1995=100
In the period 1995-1997, price indices were only available for the months
February and August. From 1998, indices are available for the months
January, April, July and October.
Index figures
Mechanical excavation for road constr.
The price index is based on price developments of wages, building
materials and equipment essential to construction of flyovers.
Changes compared to 1 year previously
The changes reflect the increase in the price index of a particular month
compared to the same month one year previously calculated to one decimal.
Mechanical excavation for road constr.
The changes are calculated from the price indices on mechanical excavation
for road construction compared to the same month one year previously.
Basis index figures 15 February 1979=100
Until 1998, index figures were calculated twice a year, i.e. on
15 February and 15 August. From 1998, these index figures are no longer
available.
Mechanical excavation for road constr.
The price index is based on mechanical excavation for flyovers and
includes :
- excavation, transport and processing of silt-containing sand;
- delivery of sand;
- processing, thickening and profiling of sand.