Price index civil engineering works
Periods | Basis index figures 15 February 1995=100 Index figures Constr. sewerage inside built-up areas (1995=100) | Basis index figures 15 February 1995=100 Changes compared to 1 year previously Constr. sewerage inside built-up areas (%) | Basis index figures 15 February 1979=100 Construction sewerage Constr. sewerage outside built-up areas (1979=100) | Basis index figures 15 February 1979=100 Construction sewerage Constr. sewerage inside built-up areas (1979=100) |
---|---|---|---|---|
2004 January | 127 | 3.0 | . | . |
2004 April | 128 | 2.5 | . | . |
2004 July | 129 | 3.0 | . | . |
2004 October | 130 | 3.8 | . | . |
Source: CBS. |
Table explanation
Index construction sewer systems and roads, mechanical excavation and
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.
Description topics
- Basis index figures 15 February 1995=100
- In the period 1995-1997, price indices were only available for the months
February and August. From 1998, indices are available for the months
January, April, July and October.- Index figures
- Constr. sewerage inside built-up areas
- The price index is based on price developments of wages, building
materials and equipment essential to sewerage construction inside built-up
areas.
- Changes compared to 1 year previously
- The changes reflect the increase in the price index of a particular month
compared to the same month one year previously calculated to one decimal.- Constr. sewerage inside built-up areas
- The changes are calculated from the price indices on sewerage construction
inside built-up areas compared to the same month one year previously.
- Basis index figures 15 February 1979=100
- Until 1998, index figures were calculated twice a year, i.e. on
15 February and 15 August. From 1998, these index figures are no longer
available.- Construction sewerage
- Constr. sewerage outside built-up areas
- The price index is based on the construction of sewer systems
and includes:
- digging of trenches;
- laying of concrete sewage pipes;
- refilling of trenches;
- removing of surplus soil.
Because these activities are very rare, this series was discontinued in
1996.
- Constr. sewerage inside built-up areas
- The price index is based on the construction and renovation of sewer
systems and includes:
- breaking up and removing of brick and asphalt paving;
- digging of trenches;
- laying of concrete sewage pipes;
- construction of sewage pipes;
- refilling of trenches;
- removing of surplus soil.