Price index civil engineering works
Explanation of symbols
Table explanation
Index construction sewer systems and roads, mechanical excavation and
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.
Description topics
- Basis index figures 15 February 1995=100
- In the period 1995-1997, price indices were only available for the months
February and August. From 1998, indices are available for the months
January, April, July and October.- Index figures
- Constr. sewerage inside built-up areas
- The price index is based on price developments of wages, building
materials and equipment essential to sewerage construction inside built-up
areas.
- Road construction
- Road construction with brick paving
- The price index is based on price developments of wages, building
materials and equipment essential to road construction with brick paving.
- Road construction with asphalt paving
- The price index is based on price developments of wages, building
materials and equipment essential to road construction partly with
asphalt and partly with concrete paving.
- Mechanical excavation for road constr.
- The price index is based on price developments of wages, building
materials and equipment essential to construction of flyovers.
- Road maintenance
- The price index is based on price developments of wages, building
materials and equipment essential to the maintenance of roads (partly
asphalt and partly concrete paving) outside built-up areas.
- Changes compared to 1 year previously
- The changes reflect the increase in the price index of a particular month
compared to the same month one year previously calculated to one decimal.- Constr. sewerage inside built-up areas
- The changes are calculated from the price indices on sewerage construction
inside built-up areas compared to the same month one year previously.
- Road construction
- Road construction with brick paving
- The changes are calculated from the price indices on road construction
with brick paving compared to the same month one year previously.
- Road construction with asphalt paving
- The changes are calculated from the price indices on road construction
with asphalt/concrete paving compared to the same month one year
previously.
- Mechanical excavation for road constr.
- The changes are calculated from the price indices on mechanical excavation
for road construction compared to the same month one year previously.
- Road maintenance
- The changes are calculated from the price indices on the maintenance of
roads with asphalt/concrete paving outside built-up areas compared to the
same month one year previously.